Revised USAF Launch Manifest Strategy

Posted: July 29, 2010 in Atlas V, Delta IV, EELV, Launch Manifest, Space Launch, USAF

EELVs Provide Margin; Margin Allows For Scheduling Flexibility

I think the new strategy–basically to match a spacecraft to a boosters six to twelve months out based on spacecraft readiness–is enabled by the studly to-orbit capabilities of the Delta IV and Atlas V EELV vehicles.

I’m guessing both families of boosters have enough margin that they can wait until later in the scheduling process to be matched with a spacecraft versus the traditional way of  matching much earlier on based on which booster was the best fit (or the only fit) to get a particular satellite on orbit.

This flexibility allows a spacecraft to go to either a Delta IV or an Atlas V and avoids committing to one versus the other two years in advance.

The idea makes plenty of sense.  The only ones who might lose out will be those secondary and orphan types of payloads looking for a cheap(er) ride to space.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s